Gallery
Construction of the Oleniy Ruchey mine, 2012
Ore preparing complex
Second and fine crushing facility (screening)
Rough crushing facility
Administrative building. May 16.
The open-cast mine. May 16.
Service shaft. Framework design
Installation of bins at the reagent facility
Electrical filter installation at the filtration and drying facility
Feeder installation at the coarse crushing facility
Panoramic view of the MPC
Administrative building
Installation of a crusher
Construction of the warm air bridge
Metalwork installation for technologic overhead road
Window installation at the main building
Production unit
Installation of a crusher
Panoramic view, March 2012
Installation of a vent system at the second and fine crushing facility
Installation of the flotation equipment at the main building
The Boiler Shop
Installation of the Drying Drum
Preparation for installation of drying drum
Assembly of tanks at the processing facility
Panorama,February 2012
Construction of the rack
Construction of G2 gallery
Construction of the chemical agents storage and preparation facility
Construction of the heating main
Construction of the filtration and drying facility
Construction site, January 31,2012